Foreword

According to the requirements specified in The Plan for Developing the First Group of Professional Standard in 2009(Document No.〔2009〕104)issued by the Ministry of Industry and Information Technology of the People's Republic of China,this Specification is revised by its development team based on wide and intensive investigations and studies made,practices summarized,comments requested as well as references to international codes and advanced foreign standards.

This Specification comprises 10 chapters and 5 appendixes.

The main technical contents of this Specification include the principles for the performance design,construction design,material selection,proper design and configuration of main component parts of reciprocating compressor for petrochemical service,the guidelines for auxiliary equipment,auxiliary piping systems,control and instruments that are important parts of the compressor train,and the requirements for inspection,testing,painting,packaging,shipment and documentation preparation for the compressor train.

This Specification is revised based on the SH/T 3143-2004 Technical Specification for Reciprocating Compressor in Petrochemical Industry,and main revisions include:

—Revising the relevant articles originally cited from API Std 618-1995 in accordance with API Std 618-2007.

—Add and delete some normative references.

—Update the versions of the normative references.

—Increase the propositional maximum product of cylinder diameter and compressor speed,and the limit of the maximum cylinder diameter.

—Combined loading of the rod,crosshead pin,or bushing shall be calculated considering one compressor valve failed in any location.

—Specify the condition which needs the cylinder cooling system and frame lubrication system.

—Specify the standard about the ultrasonic inspection of crankshaft.

—Add the measure which protects the compressor train when the compressor starts with load.

—Specify the vibration value of the compressor frame after installed on the foundation.

—Update the data sheets.

—Updatethe typical material specifications for the compressor main component parts.

—Update the material specifications for piping.

China Petrochemical Corporation(Sinopec Group)is in charge of the administration of this Specification,Sinopec Technical Center for Machinery is responsible for its routine management,and Sinopec Luoyang Petrochemical Engineering Corporation is tasked for explanation of specific technical contents.If any comments and recommendations are proposed in implementation of this Specification,please send your comments/recommendations to the routine maintenance organization and chief development organization.

Routine Management Organizations:

Sinopec Technical Center for Machinery.

Address:Floor 10,No.22,Lane 376,Yan'an West Road,Shanghai.

Postcode:200040.

Tel:021-32140411.

Fax:021-62489867.

Chief Development Organizations:

Sinopec Luoyang Petrochemical Engineering Corporation.

Address:No.27 West Zhongzhou Road,Luoyang City,He'nan Province.

Postcode:471003.

Participating Development Organizations:

Sinopec Shanghai Engineering Co.,Ltd.

Sinopec Ningbo Engineering Co.,Ltd.

Sinopec Engineering Incorporation

Shanghai Electric Compressor and Pump Co.,Ltd.

Chief Drafting Staff:

Su Yanchu Yang Limin Yang Chengjiong Li Fahai Chen Wei

Huang Shuilong Yue Ping Cheng Guangqing.

Chief Reviewing Staff:

Sheng Zhiwei Zhou Jiaxiang Zhang Jing'an Fan Deming Cao Yongjun

Xing Guikun Jiang Guo Qi Minggui Kou Dongbin Wang Chunmao

Xie Fuhai Zhu Jixin Liu Xifeng.

This Specification was initially issued in 2004 and this edition is the first revision.