- GB50403-2007炼钢机械设备工程安装验收规范(英文版)
- 中国冶金建设协会
- 53字
- 2021-03-29 04:31:52
6.6 Probe Mounting Machine and Pulling Machine
General Items
6.6.1 The allowable deviation for installation of probe mounting machine and pulling machine for sublance shall comply with the requirements in Table 6.6.1.
Quantity to be checked:100%.
Inspection method:See Table 6.6.1.
Table 6.6.1 Allowable deviation for installation of probe mounting machine and pulling machine