SH/T3006-2012石油化工控制室设计规范(英文版)
中国石油化工集团公司更新时间:2020-09-25 11:18:17
最新章节:7 Field Auxiliary Room(FAR)Building封面
版权信息
中华人民共和国住房和城乡建设部公告
Foreword
1 Scope
2 Normative References
3 Terms and Definitions
3.1 Control room
3.2 Central control room(CCR)
3.3 Local control room
3.4 Field auxiliary room(FAR)
4 Control Room Building
- APP免费
4.1 General Requirements
- APP免费
4.2 Location in General Plot Plan
- APP免费
4.3 Arrangement and Area
- APP免费
4.4 Architecture and Structure
- APP免费
4.5 Natural Lighting and Artificial Lighting
- APP免费
4.6 Heating,Ventilation,Air Conditioning and Environmental Conditions
- APP免费
4.7 Cable Entry Method and Indoor Cabling
- APP免费
4.8 Installation and Fixture of Equipments
- APP免费
4.9 Health,Safety,and Environmental Protection Requirements
- APP免费
4.10 Communication and Closed Circuit TV(CCTV)Systems
- APP免费
5 Central Control Room(CCR)Building
- APP免费
6 Local Control Room Building
- APP免费
7 Field Auxiliary Room(FAR)Building
- APP免费
Explanation of Wording in This Specification
- APP免费
Explanation of Provisions
- APP免费
Notes to Revision
- APP免费
1 Scope
- APP免费
3 Terms and Definitions
- APP免费
3.1 Control Room
- APP免费
4 Control Room Building
- APP免费
4.2 Location in General Plot Plan
- APP免费
4.3 Arrangement and Area
- APP免费
4.4 Architecture and Structure
- APP免费
4.5 Natural Lighting and Artificial Lighting
- APP免费
4.6 Heating,Ventilation,Air Conditioning and Environmental Conditions
- APP免费
4.7 Cable Entry Method and Indoor Cabling
- APP免费
4.9 Health,Safety,and Environmental Protection Requirements
- APP免费
4.10 Communication and Closed Circuit TV(CCTV)Systems
- APP免费
5 Central Control Room(CCR)Building
- APP免费
7 Field Auxiliary Room(FAR)Building
更新时间:2020-09-25 11:18:17