Forewords
1 Scope
2 Normative References
3 Terminology
3.1 Power Transformer
3.2 Oil-immersed Type Transformer
3.3 Converter Transformer
3.4 Reactor
3.5 Smoothing Reactor
3.6 Thyristor Valve
3.7 Converter Valves
3.8 Valve Cooling System
3.9 Instrument Transformer
3.10 Current Transformer
3.11 Direct Current Transducer(DCCT)
3.12 Optical Current Transformer
3.13 Voltage Transformer
3.14 Direct Voltage Divider
3.15 Capacitor
3.16 Capacitor Bank
3.17 Circuit Breaker
3.18 Disconnector
3.19 GIS(Gas Insulated Switchgear)
3.20 HGIS(Hybrid Switchgear)
3.21 Earthing Conductor
3.22 Earth-termination system
3.23 Earthing
3.24 Earthing Resistance
3.25 Concentrated Earth-termination system
3.26 Protective earthing
3.27 Earth electrode
3.28 Earthing Grid
3.29 Step Potential Difference
3.30 Touch Potential Difference
3.31 Equal potential Bonding
3.32 Equal potential Bounding Conductor
- APP免费
3.33 Earthing Electrode Cadweld
- APP免费
4 General Provisions
- APP免费
5 Thyristor Converter Valves
- APP免费
5.1 General Requirements
- APP免费
5.2 Requirements for Valve Halls
- APP免费
5.3 Installation Apparatuses and Tools
- APP免费
5.4 Inspection and Safekeeping Prior to Installation
- APP免费
5.5 Installation of Converter Valves
- APP免费
5.6 Optical Cable Laying
- APP免费
5.7 Checking and Test
- APP免费
5.8 Hand-over and Acceptance
- APP免费
6 Water Cooling System of Converter Valves
- APP免费
6.1 General Provisions
- APP免费
6.2 Checking and Safekeeping Prior to Installation
- APP免费
6.3 Installation of Internal Water Cooling System
- APP免费
6.4 Installation of External Water Cooling System
- APP免费
6.5 Check and Test
- APP免费
6.6 Handover and Acceptance
- APP免费
7 Converter Transformer and Oil-immersed Smoothing Reactor
- APP免费
7.1 General Requirements
- APP免费
7.2 Loading,Unloading,and Transportation
- APP免费
7.3 Inspection and Storage Prior to Installation
- APP免费
7.4 Nitrogen Discharge and Internal Check
- APP免费
7.5 Installation of the Proper and Accessories
- APP免费
7.6 Vacuum-pumping of the Proper
- APP免费
7.7 Oil Filling under Vacuum
- APP免费
7.8 Hot Oil Circulation
- APP免费
7.9 Overall Airtightness Checking
- APP免费
7.10 Keeping Still and Electrical Tests
- APP免费
7.11 Moving in Place within Station
- APP免费
7.12 Hand-over and Acceptance
- APP免费
8 AC and DC Filters(including AC high-voltage shunt capacitor banks)
- APP免费
8.1 General Requirements
- APP免费
8.2 Foundations,Anchor Bolts,and Suspension Structures
- APP免费
8.3 Check Prior to Installation
- APP免费
8.4 Installation of Capacitor Banks
- APP免费
8.5 Installation of Auxiliary Devices
- APP免费
8.6 Connection and Checking
- APP免费
8.7 Electrical Tests
- APP免费
8.8 Hand-over and Acceptance
- APP免费
9 DC Switchgears
- APP免费
9.1 General Requirements
- APP免费
9.2 Inspection and Safekeeping Prior to Installation
- APP免费
9.3 Installation of Insulation Platform
- APP免费
9.4 Installation of Breakers
- APP免费
9.5 Installation of Auxiliary Devices of DC Switchgear
- APP免费
9.6 Hand-over and Acceptance
- APP免费
10 DC Wall Bushings
- APP免费
10.1 General Provisions
- APP免费
10.2 Inspection and Safekeeping Prior to Installation
- APP免费
10.3 Installation and Test of Bushings
- APP免费
10.4 Hand-over and Acceptance
- APP免费
11 Dry Reactor
- APP免费
11.1 General Requirements
- APP免费
11.2 Foundations and Supports
- APP免费
11.3 Inspection and Safekeeping Prior to Installation
- APP免费
11.4 Installation and Test of Reactors
- APP免费
11.5 Hand-over and Acceptance
- APP免费
12 Air Conditioning and Ventilation System
- APP免费
12.1 General Requirements
- APP免费
12.2 Inspection and Safekeeping Prior to Installation
- APP免费
12.3 Installation of Indoor and Outdoor Air Conditioning Units
- APP免费
12.4 Installation of Ventilation Equipment
- APP免费
12.5 System Commissioning
- APP免费
12.6 Hand-over and Acceptance
- APP免费
13 Fire Protection System
- APP免费
13.1 General Requirements
- APP免费
13.2 Hand-over and Acceptance
- APP免费
14 Voltage and Current Measuring Devices and Surge Arrester
- APP免费
14.1 General Requirements
- APP免费
14.2 Inspection and Safekeeping Prior to Installation
- APP免费
14.3 Foundations and Supports
- APP免费
14.4 Installation and Test of DC Voltage Dividers and DC Current Transducers
- APP免费
14.5 Installation and Test of Capacitor Voltage Transformers
- APP免费
14.6 Installation and Test of Current Transformers
- APP免费
14.7 Installation and Test of Optical Current Transformers
- APP免费
14.8 Installation and Test of AC and DC Surge Arresters
- APP免费
14.9 Hand-over and Acceptance
- APP免费
15 Open Type Breaker,Composite Switchgear,Disconnector,and Grounding Switch
- APP免费
15.1 General Provisions
- APP免费
15.2 Hand-over and Acceptance
- APP免费
16 Gas Insulated Switchgear
- APP免费
16.1 General Provisions
- APP免费
16.2 Hand-over and Acceptance
- APP免费
17 Power Transformer and Oil Immersed High-voltage Shunt Reactor
- APP免费
17.1 General Provisions
- APP免费
17.2 Hand-over and Acceptance
- APP免费
18 Busbars and Connecting Wires
- APP免费
18.1 General Requirements
- APP免费
18.2 Hand-over and Acceptance
- APP免费
19 Installation of Boards and Cabinets,and Secondary Wiring
- APP免费
19.1 General Requirements
- APP免费
19.2 Hand-over and Acceptance
- APP免费
20 Auxiliary Power System of Converter Station
- APP免费
20.1 General Requirements
- APP免费
20.2 Hand-over and Acceptance
- APP免费
21 Communication and Monitoring Equipment
- APP免费
21.1 General Requirements
- APP免费
21.2 Hand-over and Acceptance
- APP免费
22 Outdoor Lighting
- APP免费
22.1 General Requirements
- APP免费
22.2 Hand-over and Acceptance
- APP免费
23 Fire Stopping of Cables
- APP免费
23.1 General Requirements
- APP免费
23.2 Hand-over and Acceptance
- APP免费
24 Lightening Protection and Grounding
- APP免费
24.1 General Requirements
- APP免费
24.2 Hand-over and Acceptance
更新时间:2020-09-25 11:16:06