1 Scope
2 Normative References
3 General Provisions
4 Construction Quality Acceptance
4.1 Requirements in Construction Quality Acceptance
4.2 Construction Quality Acceptance Scope Division and General Table
4.3 General Part of ST Generator Unit
4.4 Steam Turbine Proper Erection
4.5 Governing and Lubricating Oil System Erection
4.6 Generator and Exciter Erection
4.7 Water Cooled Condenser Assembly and Erection
4.8 Air Cooled Condenser System Erection
4.9 Deaerator(Storage Tank)Device Erection
4.10 HP and LP Heater Erection
4.11 Bypass System Equipment Erection
4.12 Turbine-driven Feedwater Pump Set Erection
4.13 Motor-driven Feedwater Pump Erection
4.14 Condensate Extraction Pump Erection
- APP免费
4.15 Temperature and Pressure Reducer Erection
- APP免费
4.16 Crane Equipment Erection
- APP免费
4.17 Diesel Generator Erection
- APP免费
4.18 Circulating Water Pump Erection
- APP免费
4.19 Rotating Type Screen Erection
- APP免费
4.20 Trash Remover Equipment Erection
- APP免费
4.21 Large Bulkhead Steel Gate Erection
- APP免费
4.22 Deep Well Pump Erection
- APP免费
4.23 Water Purification Equipment Erection
- APP免费
4.24 GT Proper Erection
- APP免费
4.25 GT auxiliary Equipment and Machinery Erection
- APP免费
4.26 Construction Certificate
- APP免费
5 Subitem Project Construction Quality Evaluation
- APP免费
5.1 Basic Provision
- APP免费
5.2 Evaluation Provision
- APP免费
5.3 Evaluation Content
- APP免费
5.4 Evaluation Method
- APP免费
5.5 Construction Quality Evaluation of ST Generator Proper and Auxiliary System
- APP免费
5.6 Erection of Auxiliary Machinery and Equipment inside Main Building Construction Quality Evaluation
- APP免费
5.7 Erection of Auxiliary Machinery and Equipment Outside Main Building Construction Quality Evaluation
- APP免费
5.8 Construction Quality Evaluation of ST Pipe
- APP免费
5.9 Construction Quality Evaluation of ST Proper(including Turbine-driven Feedwater Pump)Equipment,Pipe Thermal Insulation and Painting
- APP免费
5.10 Construction Quality Evaluation of GT and Auxiliary Equipment and Machinery Erection
- APP免费
5.11 Summary of Scores of All Project Parts(Scopes)of Subitem Project
- APP免费
5.12 Subitem Project Quality Evaluation Report
- APP免费
6 Individual Unit Quality Evaluation
- APP免费
7 The Overall Project Quality Evaluation
- APP免费
Appendix A(Informative) Typical Flow Path Data
- APP免费
A.1 Typical Flow Path Clearance Data of 300WM Turbine From Shanghai Turbine Works(for reference)
- APP免费
A.2 Typical flow path clearance data of 600WM turbine from Shanghai Turbine Works(for reference)
- APP免费
A.3 Typical flow path clearance data of 1000WM turbine from Shanghai Turbine Works(for reference)
- APP免费
A.4 Typical flow path clearance data of 1000WM turbine from Harbin Steam Turbine Works(for reference).
- APP免费
Appendix B(Informative) Oil Quality Grade Standard
- APP免费
Appendix C(Normative) Auxiliary Machinery Vibration
- APP免费
Appendix D(Normative) Auxiliary Machinery Centering
- APP免费
Explanation of wording in this standard
- APP免费
Explanation of Provisions
- APP免费
1 Scope
- APP免费
2 Normative References
- APP免费
3 General Provisions
- APP免费
4 Construction Quality Acceptance
- APP免费
4.1 Requirements in Construction Quality Acceptance
- APP免费
4.2 Construction Quality Acceptance Scope Division and General Table
- APP免费
5 Subitem Project Construction Quality Evaluation
- APP免费
5.1 Basic Provisions
- APP免费
5.2 Evaluation Provisions
- APP免费
5.3 Evaluation Contents
- APP免费
5.4 Evaluation Methods
- APP免费
5.5 Construction Quality Evaluation of ST Generator Proper and Auxiliary System
- APP免费
5.11 Summary of Scores of All Project Parts(Scopes)in Subitem Project
- APP免费
5.12 Subitem Project Quality Evaluation Report
- APP免费
6 Individual unit Quality Evaluation
- APP免费
7 The Overall project Quality Evaluation